The short answer: A smooth unit-turn flooring process follows six steps: inspect the floors at move-out, decide repair versus replace, choose and order product early, schedule around the rest of the make-ready, prepare the subfloor, and close out with photos and records. Getting flooring decided in the first day or two after move-out is one of the simplest ways to keep a turn on track.
Use the checklist below for your next make-ready, and adapt it to your own standards.
Why Flooring Often Delays Unit Turns
Flooring tends to be one of the last trades in a make-ready because it should go in after paint and other messy work. It also depends on product availability and the condition of the subfloor, which is not always visible until old flooring comes up. When flooring decisions wait until the end, small surprises turn into extra vacant days.
The fix is not working faster on install day. It is deciding earlier.
Step 1: Inspect Flooring at Move-Out
Walk every room during the move-out inspection and record flooring condition in writing and with photos.
Checklist:
- ☐ Photograph every room, including close-ups of damage
- ☐ Note stains, odors, burns and pet damage on carpet
- ☐ Note scratches, gouges, lifting or separated seams on LVP
- ☐ Note cracked tiles and stained or missing grout
- ☐ Check for soft spots, squeaks or uneven areas that may signal subfloor issues
- ☐ Look for signs of water damage near the kitchen sink, dishwasher, toilet, tub and water heater
- ☐ Measure or confirm square footage of each room (or pull it from your unit records)
- ☐ Record the existing product name and color if known
Good documentation helps with security deposit decisions and gives your flooring contractor what they need to quote quickly.
Step 2: Decide Repair, Clean or Replace
Not every floor needs to be replaced every turn. Use consistent standards so decisions are fast.
Consider cleaning when: carpet is in good condition with light soiling, or hard floors only need a deep clean.
Consider repair when: damage is limited to a few LVP planks or tiles, a small carpet area, or a transition strip, and you have matching product on hand.
Consider replacement when: carpet has persistent stains or odors, LVP damage is widespread, the floor has reached the end of its useful life, or the unit is scheduled for an upgrade.
Many managers also use the turn as a chance to convert carpeted living areas to LVP or tile, which can reduce future cleaning and replacement in high-traffic areas.
Step 3: Choose Product and Order Early
Once you know what is being replaced, select product right away.
Checklist:
- ☐ Use your standard spec for the property if you have one
- ☐ Confirm the product is in stock or get an availability date
- ☐ Order enough extra for cuts and waste, plus spare boxes for future repairs
- ☐ Confirm color and style match adjacent rooms or other units
- ☐ Request a written estimate before approving
If you do not have a standard spec yet, this is a good time to create one. Pick a durable LVP, a rental-grade carpet and a tile option, each in a neutral color, and use them across the property. Ordering, repairs and future turns become simpler.
Step 4: Schedule Flooring in the Right Order
Flooring should fit into the make-ready sequence so it is not damaged by other work.
A common sequence:
Step 5: Prepare the Subfloor
Subfloor preparation is where many long-term flooring problems start or are prevented.
Checklist:
- ☐ Remove old flooring, pad, tack strip and adhesive as needed
- ☐ Check the subfloor for flatness; hard surfaces like LVP and tile need a flat surface to prevent movement, gaps or cracks
- ☐ Repair damaged subfloor areas
- ☐ Check for moisture, especially on concrete slabs and near plumbing
- ☐ Clean the subfloor thoroughly before installation
Skipping prep to save a day can lead to clicking planks, separated seams or cracked tile that show up a few months into the next lease.
Step 6: Install, Inspect and Close Out
Checklist:
- ☐ Confirm expansion gaps are left at walls and fixed objects for floating floors
- ☐ Confirm transitions between rooms and materials are secure and level
- ☐ Reinstall or replace baseboards and door stops as needed
- ☐ Walk the unit after installation and note any issues
- ☐ Take completion photos for your records
- ☐ Record product name, color, lot number and install date in the unit file
- ☐ Store spare product in a labeled location
Keeping product and install records in the unit file pays off at the next turn. You will know exactly what to order for repairs and how old the floor is.
Tips for Portfolio and Multifamily Managers
- Standardize specs by property or portfolio.
- Keep an attic stock of each standard product.
- Schedule flooring at move-out notice, not after the inspection, when possible.
- Plan phased upgrades. Convert units to hard flooring one turn at a time instead of all at once.
- Use one flooring partner who knows your standards and properties.
Frequently Asked Questions
When should flooring be scheduled during a unit turn?
Flooring is usually installed after repairs and paint and before final cleaning. Decide on flooring and order product as early as possible, ideally right after the move-out inspection, so installation does not delay move-in.
Should vacant units have the air conditioning on before flooring installation?
In Arizona, yes, in most cases. Many flooring products, especially luxury vinyl plank, should be acclimated and installed within the manufacturer’s recommended temperature range. Check the product’s installation guidelines.
How do I decide whether to repair or replace rental flooring?
Repair works well when damage is limited and you have matching product. Replacement makes sense when damage is widespread, carpet has persistent stains or odors, or the floor has reached the end of its useful life.
What records should I keep after a flooring installation?
Keep the product name, color, lot number, install date, square footage, completion photos and the location of spare product. These records make future repairs and turns faster.
Get Unit-Turn Flooring Help in the Phoenix Area
The Flooring Outlet in Chandler works with property managers across Maricopa and Pinal counties on unit turns and make-ready flooring, with free estimates, professional installation and scheduling around your vacancy dates.
The Flooring Outlet · 2700 S Gilbert Road, Suite 5, Chandler, AZ 85286 · Free estimates and professional installation across Maricopa and Pinal counties.